Engineers of the North Development Office (NDO) under the CEDD, Mr Keith CHENG (right) and Ms Winnie CHAN (left), introduce the Fanling North (FLN) CLC opened in 2023.
Engineers of the North Development Office (NDO) under the CEDD, Mr Keith CHENG (right) and Ms Winnie CHAN (left), introduce the Fanling North (FLN) CLC opened in 2023.
Close