July 2000 to December 2000
Title & Description of Assignment | Type of Agreement | Date of Inviting Expression of Interest | Expected Duration | Name and Tel. No. of Contact Person |
---|---|---|---|---|
Structural Repair of Immersed Tubes of Hung Hom Cross Harbour Tunnel |
I |
Jul 2000 |
12 months |
Mr W C LEUNG |
Environmental Impact Assessment for Yung Shue Wan Development, Engineering Works, Phase 2 |
I |
Jul 2000 |
8 months |
Mr W C LUK |
10-year Extended Landslip Preventive Measures Project, Phase 2, Package G - Investigation, Design and Supervision of Landslip Preventive Works on Government Slopes and Related Studies |
DC |
Jul 2000 |
48 months |
Mr K Y CHOI |
10-year Extended Landslip Preventive Measures Project, Phase 2, Package J - Investigation, Design and Supervision of Landslip Preventive Works on Government Slopes and Related Studies |
DC |
Jul 2000 |
42 months |
Mr K Y CHOI |
Water Mains and Sewerage Works from Siu Ho Wan to Yam O - Design and Construction |
DC |
Aug 2000 |
48 months |
Mr W L CHAN |
Pa Tau Kwu Section of Chok Ko Wan Link Road - Design and Construction |
DC |
Sep 2000 |
78 months |
Mr K K CHAN |
Environmental Impact Assessment for Construction of Lung Kwu Chau Jetty |
I |
Sep 2000 |
6 months |
Ms P Y LAW |
Prediction of temperature rise and its effect on large pour concrete |
I |
Sep 2000 |
6 months |
Mr K K LIU |
Effect of micro-silica on concrete and its optimum content |
I |
Sep 2000 |
6 months |
Mr K K LIU |
Effect of change of cube curing temperature on the strength of concrete |
I |
Sep 2000 |
9 months |
Mr K K LIU |
Strategic Study on Co-disposal of Dredged Mud and Construction and Demolition Material |
FS |
Oct 2000 |
9 months |
Mr K K HO |
10-year Extended Landslip Preventive Measures Project, Phase 2, Package K - Investigation, Design and Supervision of Landslip Preventive Works on Government Slopes and Related Studies |
DC |
Oct 2000 |
42 months |
Mr K Y CHOI |