April 2000 to September 2000
PWP Item No. | Contract No & Title of Contract | Probable Date of Gazettal / Inviting Tenders | Works Category & Lowest Group Permitted to Tender | Range of Estimate of Cost | Name and Tel. No. of Contact Person |
---|---|---|---|---|---|
- |
Prequalification for Supply and Installation of Regional Computerised Control and Monitoring System at Hong Kong Eye Hospital |
Apr 2000 |
PQ |
M1 |
Mr. K.M. LEUNG |
- |
Contract for Maintenance of Electrical Mechanical, Air-conditioning and Medical Plant and Equipment in Grantham Hospital, Ruttonjee Hospital and Duchess of Kent Children's Hospital |
Apr 2000 |
SC |
M1 |
Mr. K.M. LEUNG |
Biennial Contract for the Operation and Maintenance of Heating, Ventilation and Air-conditioning System Installations for Tuen Mun Town Hall and Other Attended Venues of Government Premises |
Apr 2000* |
AIR |
M2 |
Mr. Richard CHAN |
|
Biennial Contract for the Inspection and Cleaning of Air Ducts in Heating, Ventilation and Air-conditioning Systems at Various Venues |
Apr 2000 |
SC |
M1 |
Mr. Peter CHAN |
|
1087/EM/99 - Replacement/Upgrading of the Vessel Traffic Services System |
Apr 2000 |
PQT |
M2 |
Mr C.K. Tang Jeffrey |
|
Replacement of Air Conditioning Equipment in Police Stations |
May 2000* |
AIR |
M1 |
Miss S.W. Yee |
|
Biennial Contract for the Operation and Maintenance of Heating, Ventilation and Air-conditioning Installation for Hong Kong Heritage Museum and Kwai Tsing Theatre |
May 2000* |
AIR |
M1 |
Mr. Peter CHAN |
|
Biennial Contract for the Operation and Maintenance of Electrical and Mechanical Installation for Kwai Tsing Theatre |
May 2000* |
INDU |
M1 |
Mr. Peter CHAN |
|
Biennial Contract for the Operation and Maintenance of Heating, Ventilation and Air-conditioning Installations and Electrical and Mechanical Installation in Ngau Chi Wan Centre, Admin. Office and Library |
Jun 2000* |
AIR |
M1 |
Mr. Frankie LAI |
|
Supply and Installation of Regional Computerised Control and Monitoring System at Hong Kong Eye Hospital |
Jun 2000 |
PQT |
M1 |
Mr. K.M. LEUNG |
|
Biennial Term Contract for Audio Systems & Auxiliary Equipment of Years 2000 to 2002 |
Jun 2000* |
AUDI |
M1 |
Mr Y.M. Hui Simon |
|
1009/EM/2000 - Replacement of Cooling Tower in Queen Elizabeth Hospital |
Jun 2000* |
AIR |
M1 |
Mr H.Y. Lui |
|
Replacement of Air Conditioning Equipment in Police Premises |
Jun 2000* |
AIR |
M1 |
Mr T.T. Yiu |
|
To Replace the Existing Terminal Units and Flexible Host of Medical Gas Pipeline System (MGPS) in QMH |
Aug 2000* |
STEA |
M1 |
Mr Y.H. Cheung |
|
To Replace 2230 No. Conversion Kit for Medical Gas Terminal Unit in All Wards in TMH |
Aug 2000* |
STEA |
M1 |
Mr Y.H. Cheung |
|
To Replace the Existing Terminal Units and Flexible Hose of medical Gas Pipeline System (MGPS) in PYNEH |
Aug 2000* |
STEA |
M1 |
Mr Y.H. Cheung |
|
Replacement of Chiller in Queen Mary Hospital |
Sep 2000* |
AIR |
M1 |
Mr K.S. Yuen |
|
To Replace No. 1,2,3 and 4 Cooling Towers with Associated Equipment at Roof, Block K, QMH |
Sep 2000* |
AIR |
M1 |
Mr C.K. Cheng |
|
To Install and supply of one Steam Boiler c/w Ancillary Equipment, Instrumentation Panel, Fitting and Pipework |
Sep 2000* |
STEA |
M1 |
Mr Y.H. Cheung |
|
Biennial Contract for the Operation and Maintenance of Heating, Ventilation and Air-conditioning System Installations at China Ferry Terminal |
Sep 2000* |
AIR |
M1 |
Mr. Peter CHAN |