April 2000 to September 2000
Title & Description of Assignment | Type of Agreement | Date of Inviting Expression of Interest | Expected Duration | Name and Tel. No. of Contact Person |
---|---|---|---|---|
Feasibility Study on additional sewerage and sewage treatment works in Sha Tin and Ma On Shan |
PD |
Apr 2000 |
5 months |
Mr T K LEE |
PPFS for footbridge linking Areas PD 38b and 40a at Hang Hau, Tseung Kwan O |
PD |
Apr 2000 |
5 months |
Mr W M LEUNG |
North Lantau Phase 3 development in Tung Chung - engineering works - Design and construction assignment |
DC |
Jun 2000 |
72 months |
Mr Anka LEUNG |
North Lantau phase 3 development in Tai Ho engineering works - Design and construction assignment |
DC |
Jun 2000 |
72 months |
Mr Mark LEE |
Reclamation of Sai Wan typhoon shelter and associated engineering works at Cheung Chau - Investigation, design and construction |
IDC |
Jul 2000 |
66 months |
Mr C H WONG |
Formation, Roads and Drains in Area 54, Tuen Mun - Phase I |
DC |
Jul 2000 |
54 months |
Mr S M LAI |
South East Kowloon development at Kai Tak Airport - early development package |
DC |
Aug 2000 |
100 months |
Mr Peter P C MOK |
South East Kowloon development - Kai Tak Approach Channel Reclamation |
DC |
Aug 2000 |
60 months |
Mr Andy P H YAU |