1. The Forecast of Consultancies is issued in good faith, but in no way indicates that consultancies will be invited for the particular projects listed, either at the time stated or at any time, and Government accepts no responsibility whatsoever for any loss or expenses that may be incurred as a result of publication of the Forecast.

  2. The date in Column 3 of the Forecast refers to the probable date of inviting the submission of Expressions of Interest from consultants longlisted for a Project. Consultancies which are suitable for small consultants are marked with a *.

  3. The following abbreviations are used in the Forecast
Abbreviations  
Arch Architectural
BS Building Services
C Construct
D Design
DC Design & Construct
ERSS Employment of Resident Site Staff
FS Feasibility Study
I Investigation
PD Preliminary Design
PPFS Preliminary Project Feasibility Study
QS Quantity Surveying
SE Structural Engineering